Top Left Corner Spacer Top Right Corner
Spacer Spacer
Bottom Left Corner Spacer Bottom Right Corner
|
Top Left Corner Spacer Top Right Corner
Spacer Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner Top Left Corner Spacer Top Right Corner
Spacer




AM
Dublin




AM
Chicago




PM
Kuala Lumpur
Spacer
Bottom Left Corner Spacer Bottom Right Corner Bottom Left Corner Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
Home | Directories | Events | 24-HR HelpDesk | Membership | Contacts | Magazine
Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
NEWS >HeadlinesAsiaEuropeAfrica & Middle EastNorth AmericaLatin AmericaAlternative FuelsConvenience Retailing
Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
White Border Top
Spacer
Franklin Evo Side
Spacer
White Border Bottom
Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
White Border Top
Spacer
Neotec
Spacer
White Border Bottom
Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
ZCLtop0709
Spacer
Bottom Left Corner ADVERTISEMENT Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer

Nupigeco Selected for New Total Oil Sites in Jordan

Print E-mail
Wednesday, 27 May 2009
Nupigeco pipe systems has been selected by TOTAL Jordan on the opening its first service-stations in Jordan, Al-Jubaiha and Sweileh stations on Queen Rania Street and Al Abdali station in Amman.

Nupigeco is proud to have been chosen as the supplier to TOTAL. Our Smartflex fuel piping systems were chosen for these sites as well as their ongoing expansion program in the region. Nupigeco has been directly involved with TOTAL Jordan and TOTAL Outre Mer from the outset with the design, supply and installation training as well as their installation needs of these sites and several new sites currently under construction.

Their Managing Director, Mr. Arnaud Guichard, said that these stations represent the first tangible elements of Total’s long term commitment in the region. Nupigeco is also committed to assisting the future development of this process by offering a range of new products and expertise not only in Jordan but across the whole Middle East and African regions.

These stations were also designed to allow for vapour recovery, minimizing potential hazards and upholding TOTAL's high safety standards.   By using such advanced technology like the Smartflex piping system with Barcode technology, TOTAL Jordan has been able to have all the advantages that the very latest in piping systems have to offer in reliability, traceability and a 30 year warranty.

PetrolWorld 260509

 

 
Spacer
Spacer
  Spacer  
Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
Grey Border Top
Spacer Spacer
Grey Border Bottom
Spacer
Bottom Left Corner Spacer Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
Spacer
Bottom Left Corner ADVERTISEMENT Bottom Right Corner
Spacer
Top Left Corner Spacer Top Right Corner
Spacer
Spacer
Bottom Left Corner ADVERTISEMENT Bottom Right Corner
Spacer

© 2012 PETROLWORLD.COM | TERMS & CONDITIONS  |  SITE MAP  |  CONTACT US